Check out our progress at Adamo Homes with this biweekly update. From our spec homes to our semi-custom and full custom homes, there is a lot of action happening.


 

Fox Hill: Lot 12 











Rough plumbing is in process at Lot 12- We are routing pipes through all wall cavities, connecting drain lines & water supply lines to sewer systems and it is moving along nicely. After rough-ins, we will go through inspections so that this home can continue chugging along! At Lot 26, cabinets are in progress and WOW check them out! The wood grain and lovely color scheme are coming together effortlessly. 

 

Fox Hill: Lot 26


This week we are working on interior and exterior paint! In the second picture we have a composite soffit material to look like real wood, but is more durable and does not require as much maintenance! Cabinets are also in the process of being installed. Stay tuned for updated pictures to come! 

 

Castlewood Ranch - 6802 Groveton: 


At Castlewood Ranch we have exterior and interior stone in the works (masonry). Masonry is carried out with cement & sand, and then is carefully hand placed and stacked to give the home beauty, versatility, and durability. 

 

Castle Pines Village- 6436 Holy Cross Ct












Excavation started last week! We've got the rumble strip (rocks by the driveway) set to help keep the streets clean. We will have Adamo signage installed in the next week or so! 



Check back in every other Friday for more updates!

Want more info? Call us at 303.877.4980