FOLLOW THE BUILD - September 13, 2021

Check out our progress at Adamo Homes with this biweekly update. From our spec homes to our semi-custom and full custom homes, there is a lot of action happening! 

Remuda Ranch - Lot 100:

As backfill finishes up this week, rough plumbing will begin.


Remuda Ranch - Lot 101:

Damp and Drain is running its course, which acts as moisture control for the foundation. We will then begin backfill and rough plumb this week!

Copper Blush Ct:

This project is located in The Village at Castle Pines and this is the first Single family home on Copper Blush Ct. This home is spec home, with BEAUTIFUL interior features. At the moment, this home is available!


For more information, please reach out to Liz King - liz@adamohomes.com


Balsamroot:

Rolling, rolling, rolling! Interior trim continues at this custom home near Bear Dance. The trim carpenter and his crew have been installing shiplap, crafting wood beams for the 21 ft ceiling in the Great Room, and building custom shelving from inspiration photos. The true artists are in the house, people!

The front door is now installed – we are head over heels with how much we LOVE that entry – and exterior stone has started on the back columns and sides.


Holy Cross Ct:

Forming foundation walls is critical in homebuilding. It's what your home is built on. So, this step in the process is all about understanding the soil and the environment. With careful consideration, understanding, studying, and team work, we ensure your home is on a firm foundation.






Check back in every other Friday for more updates!

Want more info? Call us at 303.877.4980

44 views0 comments

Recent Posts

See All